Harold Holt Swimming Pool Upgrade
Project Name Client Superintendent Value Time Frame
Harold Holt Swimming Pool Upgrade City of Stonnington City of Stonnington $500K January 2017 - April 2017
Project Name
Harold Holt Swimming Pool Upgrade
Client City of Stonnington
Superintendent City of Stonnington
Value $500K
Time Frame January 2017 - April 2017

The scope of the Works  included, but  not limited to the following:

  • Replacement of the pool’s surfaces, fixtures and fittings that are near the end of their life;
  • Construction of new membranes at the pool’s expansion and construction joints and inside the balance tanks and wet deck channels;
  • Implementation of pool accessibility improvements to provide permanent access point to the 25m pool for people with mobility impairment; and
  • Possible upgrade of the pool’s hydraulic system